| Thursday, March 11, 2010
|
Register
Login |
|
|
|
|
|
|
|
Go
|
|
|
|
|
|
|
|
|
|
1997 to 1998 :
|
 Insider Technologies Limited (ITL)
Spinnaker Court, Chandlers Point,
37 Broadway, Salford Quays,
Manchester, United Kingdom.
M50 2YR
|
|
Area :
|
Reflex 80:20 Development
Product Management, Design, Coding and Testing
|
|
Website :
|
www.insidertech.co.uk
|
|
Position :
|
Product Manager
|
|
|
|
|
Programming Languages
(HP NonStop):
|
TAL, C, C++, COBOL85, ENSCRIBE, TACL, NonStop & Microsoft SQL
Various NSK Utilities – SCF, SPOOLCOM, PATHCOM, PUP, INSPECT, EMS etc.
|
|
Operating
Systems :
|
hp NonStop Server (formerly TANDEM) GUARDIAN with
PATHWAY on K and S series
Windows 98
|
|
Software
Packages :
|
CrystalPoint OutsideView
Microsoft Project
Microsoft PowerPoint
Microsoft Outlook
Microsoft Excel
Microsoft Word
|
|
Other :
|
N/A
|
|
Programming Languages
(HP NonStop):
|
TAL, C, C++, COBOL85, ENSCRIBE, TACL, NonStop & Microsoft SQL
Various NSK Utilities – SCF, SPOOLCOM, PATHCOM, PUP, INSPECT, EMS etc.
|
|
Operating
Systems :
|
hp NonStop Server (formerly TANDEM) GUARDIAN with
PATHWAY on K and S series
Windows 98
|
|
Software
Packages :
|
CrystalPoint OutsideView
Microsoft Project
Microsoft PowerPoint
Microsoft Outlook
Microsoft Excel
Microsoft Word
|
|
Other :
|
N/A
|
|
|
|
|
My first project management task after my 3-month placement at CRESTCo in London, involved adding Management Reporting capability to the Reflex 80:20 NSK system-monitoring product. This was the first Insider Technologies initiative to link the NSK platform with a remote Windows server for MIS reporting functions. PATHWAY servers were designed and engineered to relay NSK metrics extracted by Reflex, to a Windows Microsoft SQL database. This allowed for the generation of both tabular and graphical reports on NSK platform performance trends between user specified dates.
|
|
My role as project manager involved the design of the overall NSK relay architecture and managing the staff assigned to the project and their individual tasks using Microsoft Project. All project status and issues were reported to the Operations Director.
|
|
My first project management task after my 3-month placement at CRESTCo in London, involved adding Management Reporting capability to the Reflex 80:20 NSK system-monitoring product. This was the first Insider Technologies initiative to link the NSK platform with a remote Windows server for MIS reporting functions. PATHWAY servers were designed and engineered to relay NSK metrics extracted by Reflex, to a Windows Microsoft SQL database. This allowed for the generation of both tabular and graphical reports on NSK platform performance trends between user specified dates.
|
|
My role as project manager involved the design of the overall NSK relay architecture and managing the staff assigned to the project and their individual tasks using Microsoft Project. All project status and issues were reported to the Operations Director.
|
|
|
|
|
|
|
|
|
|